This statistic displays as a percentage the average cost overrun for electricity consumption projects across various project types, as of January 2014. Data is based on 401 energy infrastructure projects realised around the world. Nuclear reactor construction had the highest average cost overrun among the different types. On average the cost overrun for nuclear reactor projects was 117.3 percent.
Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type
Figures are based on data collected by the authors Benjamin Sovacool, Alex Gilbert and Daniel Nugent.
Study included 401 electricity infrastructure projects.
Cost figures were adjusted for currency differences and inflation based on the United States Dollar at 2012.
Profit from the additional features of your individual account
Currently, you are using a shared account. To use individual functions (e.g., mark statistics as favourites, set
statistic alerts) please log in with your personal account.
If you are an admin, please authenticate by logging in again.
Learn more about how Statista can support your business.
QualEnergia. (July 31, 2014). Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type [Graph]. In Statista. Retrieved October 02, 2024, from https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/
QualEnergia. "Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type." Chart. July 31, 2014. Statista. Accessed October 02, 2024. https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/
QualEnergia. (2014). Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type. Statista. Statista Inc.. Accessed: October 02, 2024. https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/
QualEnergia. "Average Cost Overrun for Energy Infrastructure Projects Worldwide as of 2014, by Project Type." Statista, Statista Inc., 31 Jul 2014, https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/
QualEnergia, Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type Statista, https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/ (last visited October 02, 2024)
Average cost overrun for energy infrastructure projects worldwide as of 2014, by project type [Graph], QualEnergia, July 31, 2014. [Online]. Available: https://www.statista.com/statistics/526710/average-cost-overrun-energy-infrastructure-projects/