Installed capacity of nuclear power plant in Poland 2035-2045, by scenario
Poland's first nuclear power unit is expected to be built in 2035. Under the "slow optimization" scenario, seven units with a total capacity of 7.7 gigawatts are to be built every 2045. Under the strategic option, six nuclear reactors with a total capacity of 6.6 gigawatts are expected to be built by 2045.