As of November 2023, the Genkai-4 and Genkai-3 nuclear power plants of Kyushu Electric Power, as well as the Ohi-3 and Ohi-4 nuclear power plants of Kansai Electric Power, reached an output of around 1.18 thousand megawatt electrical.
After the nuclear disaster in Fukushima Prefecture in 2011, all nuclear reactors in Japan were shut down for safety inspections. The first reactors were restarted in 2015.
Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant
(in megawatt electrical)
Adjust the presentation of the statistic and data points.
Share the statistic on social media channels or embed the statistic in your
website using "Embed Code", where available.
Cite this statistic and select one of the following formats: APA, Chicago, Harvard, MLA & Bluebook.
Print the statistic including description and metadata.
Chart type
Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant
Share this statistic
You have no right to use this feature.
Make sure to contact us if you are interested in scientific citation.
You can upgrade your account to enable this functionality for all statistics.
This feature is not available with your current account.Request access
Figures only include the output of nuclear power plants that were restarted for commercial operation, after official approval by the Japan Nuclear Regulation Authority (NRA).
Learn more about how Statista can support your business.
JAIF. (November 15, 2023). Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant (in megawatt electrical) [Graph]. In Statista. Retrieved May 16, 2025, from https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/
JAIF. "Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant (in megawatt electrical)." Chart. November 15, 2023. Statista. Accessed May 16, 2025. https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/
JAIF. (2023). Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant (in megawatt electrical). Statista. Statista Inc.. Accessed: May 16, 2025. https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/
JAIF. "Electricity Production from Operable Nuclear Power Plants in Japan as of November 2023, by Power Plant (in Megawatt Electrical)." Statista, Statista Inc., 15 Nov 2023, https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/
JAIF, Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant (in megawatt electrical) Statista, https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/ (last visited May 16, 2025)
Electricity production from operable nuclear power plants in Japan as of November 2023, by power plant (in megawatt electrical) [Graph], JAIF, November 15, 2023. [Online]. Available: https://www.statista.com/statistics/1209475/japan-output-operable-nuclear-reactors-by-power-plant/
Profit from additional features with an Employee Account
Please create an employee account to be able to mark statistics as favorites.
Then you can access your favorite statistics via the star in the header.
Profit from the additional features of your individual account
Currently, you are using a shared account. To use individual functions (e.g., mark statistics as favourites, set
statistic alerts) please log in with your personal account.
If you are an admin, please authenticate by logging in again.